{"id":1831,"date":"2023-08-02T14:29:19","date_gmt":"2023-08-02T12:29:19","guid":{"rendered":"https:\/\/sunnyvg.hr\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/"},"modified":"2023-10-26T13:09:28","modified_gmt":"2023-10-26T11:09:28","slug":"the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica","status":"publish","type":"post","link":"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/","title":{"rendered":"The first solar power plant installed at the University of Applied Sciences Velika Gorica"},"content":{"rendered":"\n<p>With the installation of the first solar power plant on the roof of the University of Applied Sciences Velika Gorica, the realization of the project &#8220;Velika Gorica Solar City \u2013 Countdown&#8221; has physically begun, which will equip 22 public buildings in our city with solar power plants.<\/p>\n\n<p>The aim of this project is to use solar energy for the production of electricity in public buildings in the City of Velika Gorica and thus promote the use of renewable energy sources and thus start the transition of the city in the direction of carbon neutrality by raising the level of awareness of citizens about the need to invest in renewable energy sources. Solar power plants for the production of electricity from solar energy will be located on 22 public buildings in the administrative area of the City of Velika Gorica \u2013 primary schools, kindergartens, community homes and sports facilities so that all areas are equally represented regardless of whether they are facilities in the central settlement or those in rural areas of the City. The total installed capacity of all power plants will be 588.4 kWp, and solar power plants will replace 37% of the electricity needs of the buildings involved in the project.<br\/><\/p>\n\n<p>The University of Applied Sciences Velika Gorica, along with the international energy farm foundation from Norway and the Tourist Board of velika Gorica, is one of the project partners, and is also the first facility where the installation of equipment started. The expected annual electricity production is about 22.68 MWh, which will come from 48 photovoltaic modules with a nominal power of 20 kW.<\/p>\n\n<p><br\/>Project Velika Gorica Solar City \u2013 COUNTDOWN is financed by Iceland, Liechtenstein and Norway through the European Economic Area Financial Mechanism for the period 2014. until 2021 Under the &#8220;Energy and Climate Change&#8221; programme. The total value of the project is over 654 thousand euros, of which the amount of grants is 81.48% of this amount.<\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"767\" data-id=\"1796\"  src=\"https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0409-1024x767.jpg\" alt=\"\" class=\"wp-image-1796\" srcset=\"https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0409-1024x767.jpg 1024w, https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0409-300x225.jpg 300w, https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0409-768x575.jpg 768w, https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0409.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"767\" data-id=\"1793\"  src=\"https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0425-1024x767.jpg\" alt=\"\" class=\"wp-image-1793\" srcset=\"https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0425-1024x767.jpg 1024w, https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0425-300x225.jpg 300w, https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0425-768x575.jpg 768w, https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0425.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"767\" data-id=\"1795\"  src=\"https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0440-1024x767.jpg\" alt=\"\" class=\"wp-image-1795\" srcset=\"https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0440-1024x767.jpg 1024w, https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0440-300x225.jpg 300w, https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0440-768x575.jpg 768w, https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0440.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"767\" data-id=\"1797\"  src=\"https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0475-1024x767.jpg\" alt=\"\" class=\"wp-image-1797\" srcset=\"https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0475-1024x767.jpg 1024w, https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0475-300x225.jpg 300w, https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0475-768x575.jpg 768w, https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0475.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"683\" data-id=\"1791\"  src=\"https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/FB7A7445-1024x683.jpg\" alt=\"\" class=\"wp-image-1791\" srcset=\"https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/FB7A7445-1024x683.jpg 1024w, https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/FB7A7445-300x200.jpg 300w, https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/FB7A7445-768x512.jpg 768w, https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/FB7A7445.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>With the installation of the first solar power plant on the roof of the University of Applied Sciences Velika Gorica, the realization of the project &#8220;Velika Gorica Solar City \u2013 Countdown&#8221; has physically begun, which will equip 22 public buildings in our city with solar power plants. The aim of this project is to use [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":1801,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"ocean_post_layout":"","ocean_both_sidebars_style":"","ocean_both_sidebars_content_width":0,"ocean_both_sidebars_sidebars_width":0,"ocean_sidebar":"0","ocean_second_sidebar":"0","ocean_disable_margins":"enable","ocean_add_body_class":"","ocean_shortcode_before_top_bar":"","ocean_shortcode_after_top_bar":"","ocean_shortcode_before_header":"","ocean_shortcode_after_header":"","ocean_has_shortcode":"","ocean_shortcode_after_title":"","ocean_shortcode_before_footer_widgets":"","ocean_shortcode_after_footer_widgets":"","ocean_shortcode_before_footer_bottom":"","ocean_shortcode_after_footer_bottom":"","ocean_display_top_bar":"default","ocean_display_header":"default","ocean_header_style":"","ocean_center_header_left_menu":"0","ocean_custom_header_template":"","ocean_custom_logo":0,"ocean_custom_retina_logo":0,"ocean_custom_logo_max_width":0,"ocean_custom_logo_tablet_max_width":0,"ocean_custom_logo_mobile_max_width":0,"ocean_custom_logo_max_height":0,"ocean_custom_logo_tablet_max_height":0,"ocean_custom_logo_mobile_max_height":0,"ocean_header_custom_menu":"","ocean_menu_typo_font_family":"0","ocean_menu_typo_font_subset":"","ocean_menu_typo_font_size":0,"ocean_menu_typo_font_size_tablet":0,"ocean_menu_typo_font_size_mobile":0,"ocean_menu_typo_font_size_unit":"px","ocean_menu_typo_font_weight":"","ocean_menu_typo_font_weight_tablet":"","ocean_menu_typo_font_weight_mobile":"","ocean_menu_typo_transform":"","ocean_menu_typo_transform_tablet":"","ocean_menu_typo_transform_mobile":"","ocean_menu_typo_line_height":0,"ocean_menu_typo_line_height_tablet":0,"ocean_menu_typo_line_height_mobile":0,"ocean_menu_typo_line_height_unit":"","ocean_menu_typo_spacing":0,"ocean_menu_typo_spacing_tablet":0,"ocean_menu_typo_spacing_mobile":0,"ocean_menu_typo_spacing_unit":"","ocean_menu_link_color":"","ocean_menu_link_color_hover":"","ocean_menu_link_color_active":"","ocean_menu_link_background":"","ocean_menu_link_hover_background":"","ocean_menu_link_active_background":"","ocean_menu_social_links_bg":"","ocean_menu_social_hover_links_bg":"","ocean_menu_social_links_color":"","ocean_menu_social_hover_links_color":"","ocean_disable_title":"default","ocean_disable_heading":"default","ocean_post_title":"","ocean_post_subheading":"","ocean_post_title_style":"","ocean_post_title_background_color":"","ocean_post_title_background":0,"ocean_post_title_bg_image_position":"","ocean_post_title_bg_image_attachment":"","ocean_post_title_bg_image_repeat":"","ocean_post_title_bg_image_size":"","ocean_post_title_height":0,"ocean_post_title_bg_overlay":0.5,"ocean_post_title_bg_overlay_color":"","ocean_disable_breadcrumbs":"default","ocean_breadcrumbs_color":"","ocean_breadcrumbs_separator_color":"","ocean_breadcrumbs_links_color":"","ocean_breadcrumbs_links_hover_color":"","ocean_display_footer_widgets":"default","ocean_display_footer_bottom":"default","ocean_custom_footer_template":"","ocean_post_oembed":"","ocean_post_self_hosted_media":"","ocean_post_video_embed":"","ocean_link_format":"","ocean_link_format_target":"self","ocean_quote_format":"","ocean_quote_format_link":"post","ocean_gallery_link_images":"on","ocean_gallery_id":[]},"categories":[1],"tags":[31,33,32],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>The first solar power plant installed at the University of Applied Sciences Velika Gorica - Sunny VG<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The first solar power plant installed at the University of Applied Sciences Velika Gorica - Sunny VG\" \/>\n<meta property=\"og:description\" content=\"With the installation of the first solar power plant on the roof of the University of Applied Sciences Velika Gorica, the realization of the project &#8220;Velika Gorica Solar City \u2013 Countdown&#8221; has physically begun, which will equip 22 public buildings in our city with solar power plants. The aim of this project is to use [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/\" \/>\n<meta property=\"og:site_name\" content=\"Sunny VG\" \/>\n<meta property=\"article:published_time\" content=\"2023-08-02T12:29:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-10-26T11:09:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0475-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"899\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"SunnyVG\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SunnyVG\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/\"},\"author\":{\"name\":\"SunnyVG\",\"@id\":\"https:\/\/sunnyvg.hr\/en\/#\/schema\/person\/d08675bdd5b8b6e17fc496b7f59dc684\"},\"headline\":\"The first solar power plant installed at the University of Applied Sciences Velika Gorica\",\"datePublished\":\"2023-08-02T12:29:19+00:00\",\"dateModified\":\"2023-10-26T11:09:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/\"},\"wordCount\":323,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/sunnyvg.hr\/en\/#organization\"},\"keywords\":[\"solar power plant\",\"University of Applied Sciences Velika Gorica\",\"velika gorica solar city\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/\",\"url\":\"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/\",\"name\":\"The first solar power plant installed at the University of Applied Sciences Velika Gorica - Sunny VG\",\"isPartOf\":{\"@id\":\"https:\/\/sunnyvg.hr\/en\/#website\"},\"datePublished\":\"2023-08-02T12:29:19+00:00\",\"dateModified\":\"2023-10-26T11:09:28+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Po\u010detna stranica\",\"item\":\"https:\/\/sunnyvg.hr\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The first solar power plant installed at the University of Applied Sciences Velika Gorica\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/sunnyvg.hr\/en\/#website\",\"url\":\"https:\/\/sunnyvg.hr\/en\/\",\"name\":\"Sunny VG\",\"description\":\"Velika Gorica Solarni Grad ODBROJAVANJE\",\"publisher\":{\"@id\":\"https:\/\/sunnyvg.hr\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/sunnyvg.hr\/en\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/sunnyvg.hr\/en\/#organization\",\"name\":\"Sunny VG\",\"url\":\"https:\/\/sunnyvg.hr\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/sunnyvg.hr\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/03\/cropped-VG_Logo_01.png\",\"contentUrl\":\"https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/03\/cropped-VG_Logo_01.png\",\"width\":570,\"height\":409,\"caption\":\"Sunny VG\"},\"image\":{\"@id\":\"https:\/\/sunnyvg.hr\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/sunnyvg.hr\/en\/#\/schema\/person\/d08675bdd5b8b6e17fc496b7f59dc684\",\"name\":\"SunnyVG\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/sunnyvg.hr\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/20ec7f0a61400de0bf3673dda27de094?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/20ec7f0a61400de0bf3673dda27de094?s=96&d=mm&r=g\",\"caption\":\"SunnyVG\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The first solar power plant installed at the University of Applied Sciences Velika Gorica - Sunny VG","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/","og_locale":"en_US","og_type":"article","og_title":"The first solar power plant installed at the University of Applied Sciences Velika Gorica - Sunny VG","og_description":"With the installation of the first solar power plant on the roof of the University of Applied Sciences Velika Gorica, the realization of the project &#8220;Velika Gorica Solar City \u2013 Countdown&#8221; has physically begun, which will equip 22 public buildings in our city with solar power plants. The aim of this project is to use [&hellip;]","og_url":"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/","og_site_name":"Sunny VG","article_published_time":"2023-08-02T12:29:19+00:00","article_modified_time":"2023-10-26T11:09:28+00:00","og_image":[{"width":1200,"height":899,"url":"https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/08\/DJI_0475-1.jpg","type":"image\/jpeg"}],"author":"SunnyVG","twitter_card":"summary_large_image","twitter_misc":{"Written by":"SunnyVG","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/#article","isPartOf":{"@id":"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/"},"author":{"name":"SunnyVG","@id":"https:\/\/sunnyvg.hr\/en\/#\/schema\/person\/d08675bdd5b8b6e17fc496b7f59dc684"},"headline":"The first solar power plant installed at the University of Applied Sciences Velika Gorica","datePublished":"2023-08-02T12:29:19+00:00","dateModified":"2023-10-26T11:09:28+00:00","mainEntityOfPage":{"@id":"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/"},"wordCount":323,"commentCount":0,"publisher":{"@id":"https:\/\/sunnyvg.hr\/en\/#organization"},"keywords":["solar power plant","University of Applied Sciences Velika Gorica","velika gorica solar city"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/","url":"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/","name":"The first solar power plant installed at the University of Applied Sciences Velika Gorica - Sunny VG","isPartOf":{"@id":"https:\/\/sunnyvg.hr\/en\/#website"},"datePublished":"2023-08-02T12:29:19+00:00","dateModified":"2023-10-26T11:09:28+00:00","breadcrumb":{"@id":"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/sunnyvg.hr\/en\/the-first-solar-power-plant-installed-at-the-university-of-applied-sciences-velika-gorica\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Po\u010detna stranica","item":"https:\/\/sunnyvg.hr\/en\/"},{"@type":"ListItem","position":2,"name":"The first solar power plant installed at the University of Applied Sciences Velika Gorica"}]},{"@type":"WebSite","@id":"https:\/\/sunnyvg.hr\/en\/#website","url":"https:\/\/sunnyvg.hr\/en\/","name":"Sunny VG","description":"Velika Gorica Solarni Grad ODBROJAVANJE","publisher":{"@id":"https:\/\/sunnyvg.hr\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/sunnyvg.hr\/en\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/sunnyvg.hr\/en\/#organization","name":"Sunny VG","url":"https:\/\/sunnyvg.hr\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/sunnyvg.hr\/en\/#\/schema\/logo\/image\/","url":"https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/03\/cropped-VG_Logo_01.png","contentUrl":"https:\/\/sunnyvg.hr\/wp-content\/uploads\/2023\/03\/cropped-VG_Logo_01.png","width":570,"height":409,"caption":"Sunny VG"},"image":{"@id":"https:\/\/sunnyvg.hr\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/sunnyvg.hr\/en\/#\/schema\/person\/d08675bdd5b8b6e17fc496b7f59dc684","name":"SunnyVG","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/sunnyvg.hr\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/20ec7f0a61400de0bf3673dda27de094?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/20ec7f0a61400de0bf3673dda27de094?s=96&d=mm&r=g","caption":"SunnyVG"}}]}},"_links":{"self":[{"href":"https:\/\/sunnyvg.hr\/en\/wp-json\/wp\/v2\/posts\/1831"}],"collection":[{"href":"https:\/\/sunnyvg.hr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sunnyvg.hr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sunnyvg.hr\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/sunnyvg.hr\/en\/wp-json\/wp\/v2\/comments?post=1831"}],"version-history":[{"count":3,"href":"https:\/\/sunnyvg.hr\/en\/wp-json\/wp\/v2\/posts\/1831\/revisions"}],"predecessor-version":[{"id":1834,"href":"https:\/\/sunnyvg.hr\/en\/wp-json\/wp\/v2\/posts\/1831\/revisions\/1834"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sunnyvg.hr\/en\/wp-json\/wp\/v2\/media\/1801"}],"wp:attachment":[{"href":"https:\/\/sunnyvg.hr\/en\/wp-json\/wp\/v2\/media?parent=1831"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sunnyvg.hr\/en\/wp-json\/wp\/v2\/categories?post=1831"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sunnyvg.hr\/en\/wp-json\/wp\/v2\/tags?post=1831"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}